Building a new restaurant is always a balancing act between design intent, schedule, and
teamwork. For the Dunkin’ Minnetonka project, our team at Kindred Construction Solutions
had the unique challenge of delivering a full build-out over the holiday season — from late
2024 through early 2025.
Despite the tight timeline, coordination hurdles, and a few surprises along the way, the
project came together seamlessly thanks to close collaboration with the architect, HVAC
subcontractor, and client team.

Solving for Ceiling Heights and Ductwork Challenges
During early construction, our team discovered that the roof structure didn’t align with the
landlord-provided drawings, creating a conflict between the ceiling height and duct layout.
Rather than delay the schedule or compromise the design, our project team came
together; Kindred Construction Solutions, the HVAC subcontractor, and the architect to
brainstorm creative solutions. Through thoughtful design adjustments and the HVAC
contractor being willing to get creative and put his skills to the test, we were able to
maximize the ceiling height, only losing about 2 inches instead of the 14” inches we were
looking at, without any additional cost to the client.
That’s the kind of collaboration we pride ourselves on, smart problem solving that protects
both the design vision and the project budget.
Meeting Rigorous Franchise Standards
As a national brand, Dunkin’ maintains very high standards for quality and finish. Each
project concludes with a corporate punch list walkthrough to ensure every detail aligns
with brand specifications.
We’re proud to share that this project passed with zero punch list items, a testament to the
craftsmanship, communication, and pride our team brings to every build.


A Collaborative Approach from the Start to Finish
From project kickoff through final inspection, our team stayed focused on communication
and teamwork. Coordinating during the holidays required flexibility, daily check-ins, and
creative scheduling but the results were worth it.
Every member of the team worked together to make sure this project opened on time, on
budget, and with the quality that Dunkin’ expects.

Project Snapshot
Project Type: Restaurant Build-Out
Location: Minnetonka, Minnesota
Timeline: January 2025 – March 2025
Scope: Full tenant improvement from vanilla shell
Key Highlights:
Resolved ceiling height and ductwork conflict with creative design
coordination
Completed on schedule despite holiday-season constraints
Zero punch list items on final corporate walkthrough
Partner With a Minneapolis General Contractor Who Understands Restaurants
At Kindred Construction Solutions, we specialize in restaurant construction from first
conceptual design to final inspections. Our collaborative approach brings architects,
engineers, and subcontractors together early to identify challenges before they become
costly changes.
If you’re planning your next restaurant or tenant improvement project, let’s connect early.
Together, we’ll make sure your space is designed and built for success.
Contact Kindred Construction Solutions to start your project today.